Planning a patio in Perth or anywhere in Western Australia is exciting — it means more outdoor living, better entertaining spaces, and extra value for your home. But before construction begins, you’ll need to consider patio building permit WA.
Navigating council approvals and regulations might seem daunting, but it’s a crucial step to ensure your new patio is safe, legal, and compliant with WA standards. In this guide, we’ll walk you through the patio building permit process WA, explain why it’s important, and show how Patio Factory helps homeowners from permit to finished patio.
Yes — most patios in Western Australia require building approval from your local council. This is because patios are considered a permanent structure that must comply with the Building Code of Australia (BCA).
Safety & Structural Integrity: Ensures your patio can withstand strong winds, storms, and local conditions.
Compliance: Aligns with council zoning and setback requirements.
Future Value: Unapproved patios can cause issues when selling your property.
Insurance: Many insurers will not cover damage to unapproved structures.
Choose your patio style (gable, flat, dome, or skillion).
Decide between a DIY patio kit or professional installation.
Collect site measurements and property plans.
Engineering certification is often required to prove structural safety.
Patio Factory supplies engineered plans with all DIY kits and professional builds.
Lodge your application with your local council. This typically includes:
Completed building permit form.
Engineering drawings and specifications.
Site plan showing setbacks.
Payment of council application fees.
Council reviews your application against building codes and zoning laws.
Processing time can take 10–25 business days, depending on your council.
Once approved, you’ll receive a Building Permit allowing construction to begin.
For DIY kits, this means you can start building. For professional installs, Patio Factory handles this for you.
Your patio is built either by you (DIY) or professionals.
In some cases, council may conduct a final inspection to confirm compliance.
At Patio Factory, we know that paperwork and permits can feel overwhelming. That’s why we:
Handle council applications on behalf of professional installation clients.
Provide all necessary engineering drawings with every patio kit.
Guide DIY customers through the steps to make the approval process easier.
Ensure every design complies with WA regulations and BCA standards.
This means less stress for you — and a smoother path to enjoying your new outdoor space.
On average, 2–4 weeks depending on your local council.
It’s not recommended. Non-approved patios risk fines, insurance issues, and problems if you sell your home.
DIY: You apply directly to your council.
Professional install: Patio Factory takes care of everything.
Fees vary by council but usually range from $150–$300.
Peace of mind knowing your patio is safe and legal.
Avoid delays if you plan to sell your home.
Full warranty coverage on materials and installation.
Insurance protection for weather damage.
A patio is a fantastic way to enhance your Perth home, but navigating building permits in WA is a step you can’t skip. Whether you choose a DIY patio kit or professional installation, securing approval ensures your investment is protected.
At Patio Factory, we make the process stress-free. From supplying engineered drawings to handling the entire council application, we’ve got you covered from permit to patio.
👉 Ready to start your project? Contact Patio Factory today for expert help with designs, approvals, and installation.
Check out out social Media